MIL-DTL-45300C
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this specification.
b. Type of cap required (see 1.2).
c. If first article inspection is not required (see 3.1).
d. If cap finish is other than as specified (see 3.5).
e. If responsibility for inspection is other than as specified (see 4.1).
f. If responsibility for inspection equipment is other than as specified (see 4.1.2).
g. If inspection conditions is other than as specified (see 4.3)
h. If first article inspection sample size is other than as specified (see 4.4).
i. Packaging requirements (see 5.1)
6.3 Definitions.
6.3.1 Recovered materials. "Recovered materials" means materials that have been collected or recovered from
solid waste (see 6.3.2).
6.3.2 Solid waste. "Solid waste" means (a) any garbage, refuse, or sludge from a waste treatment plant, water
supply treatment plant, or air pollution control facility; and (b) other discarded material, including solid, liquid,
semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations,
and from community activities. It does not include solid or dissolved material in domestic sewage, or solid or
dissolved material in irrigation return flows or industrial discharges which are point sources subject to permits under
section 402 of the Clean Water Act, (33 U.S.C. 1342 et seq.) or source nuclear, or byproduct material as defined by
the atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) (Source: Federal Acquisition Regulations, section 23.402).
6.4 Subject term (key word) listing.
Fording valve
Free breathing
Non-vented
6.5 Changes from previous issue. Asterisks (or vertical lines) are not used in this revision to identify changes with
respect to the previous issue due to the extensiveness of the changes.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business