MIL-PRF-62678B
TABLE IV. Sampling plan for conformance inspection.
Sample size
Examination
Inspection lot size
Major
Minor
Test
5
2 to 8
*
2
5
9 to 15
13
2
5
16 to 25
13
2
5
26 to 50
13
5
7
51 to 90
13
5
11
91 to 150
13
6
13
151 to 280
20
7
16
281 to 500
29
9
19
501 to 1200
34
11
23
1201 to 3200
42
13
29
3,201 to 10,000
50
15
35
10,001 to 35,000
60
15
40
35,001 to 150,000
74
15
40
150,001 to 500,000
90
15
40
102
500,001 and over
15
*Indicates entire lot must be inspected (100% inspection).
4.4.4 Conformance inspection failure. Any item that fails to conform to any specified
requirement shall be rejected; any failure (one or more) of the selected sample in either the
Major/Minor categories or test for the appropriate inspection lot size shall constitute a failure of
the entire lot. The rejected item(s) may be repaired or corrected and resubmitted for inspection.
If the contractor utilizes sampling inspection as an element of his inspection system, rejected
inspection lots may be resubmitted for acceptance if the contractor performs 100 percent
inspection on the lot for those characteristics which were defective and resulted in rejection of
the lot and removes all defective units or obtains procuring activity approval to resample the lot
due to the insignificance of the defects. Resubmitted lots shall be kept separate from new lots
and shall be clearly identified as resubmitted lots.
4.5 Control tests. Control tests shall be conducted on three pump assemblies from each
lot of 500 units consecutively produced, except that not more than six tests shall be performed in
a one month period, nor less than three tests in a one month period. The pump shall be subjected
to the control tests specified in table II in the order listed in table VI.